1,502
11
Essay, 3 pages (650 words)

Arizona modern portland cement is usually attributed

ARIZONA CONCRETEJohn McCollamGeology 101, Section 12262Randy Porch20 November 1996ARIZONA CONCRETEAccording to the Mine Faculty at the University of Arizona, cement is manufactured primarily from suitable limestone and shale rocks. Arizona had two dry-process cement plants in 1969, namely the Arizona Portland Cement Company plant in Pima County, near Tucson, and the American Cement Corporation plant at Clarkdale, in Yavapai County (52-53). The use of cementing materials goes back to the ancient Egyptians and Romans, but the invention of modern portland cement is usually attributed to Joseph Aspdin, a builder in Leeds, England, who obtained a patent for it in 1824. Currently, the annual world production of portland cement is around 700 million metric tons (Danbury). Many people use the words concrete and cement interchangeably, but they= re not.

Concrete is to cement as a cake is to flour. Concrete is a mixture of ingredients that includes cement but contains other ingredients also (Day 6-7). Portland cement is produced by pulverizing clinker consisting essentially of hydraulic calcium silicates along with some calcium aluminates and calcium aluminoferrites and usually containing one or more forms of calcium sulfate (gypsum) as an interground addition. Materials used in the manufacture of portland cement must contain appropriate proportions of calcium oxide, silica, alumina, and iron oxide components. During manufacture, analyses of all materials are made frequently to ensure a uniformly high quality cement.

Selected raw materials are crushed, milled, and proportioned in such a way that the resulting mixture has the desired chemical composition. The raw materials are generally a mixture of calcareous (calcium oxide) material, such as limestone, chalk or shells, and an argillaceous (silica and alumina) material such as clay, shale, or blast-furnace slag. Either a dry or a wet process is used. In the dry process, grinding and blending operations are done with dry materials. In the wet process, the grinding and blending are done with the materials in slurry form. In other respects, the dry and wet processes are very much alike.

After blending, the ground raw material is fed into the upper end of a kiln. The raw mix passes through the kiln at a rate controlled by the slope and rotational speed of the kiln. Burning fuel (powdered coal, oil, or gas) is forced into the lower end of the kiln where temperatures of 2600F to 3000F change the raw material chemically into cement clinker, grayish-black pellets about the size of 1/2-in.-diameter marbles. The clinker is cooled and then pulverized. During this operation a small amount of gypsum is added to regulate the setting time of the cement.

The clinker is ground so fine that nearly all of it passes through a No. 200 mesh (75 micron) sieve with 40, 000 openings per square inch. This extremely fin gray powder is portland cement (Kosmatka and Panarese 12-15). Dany Seymore of Show Low Ready Mix said that the cement used by Show Low Ready Mix is trucked in by Apex Freight Company and comes from the cement plant in Clarkdale, Arizona, now know as Phoenix Cement.

Their aggregate comes from Brimhall Sand and Rock in Snowflake, Arizona. Show Low Ready Mix uses Fly Ash from the A. P. S. power plant just out side of Joseph City, Arizona, in their cement. The mixtures they use are as follows: Silicia DioxideCement 21% Ash 62%Aluminum TrioxideCement 4%Ash 23%Ferric OxideCement 3%Ash 6%Calcium OxideCement 64%Ash 3. 5%Mag.

OxideCement 2. 5%Ash 1. 2%Sulfur TrioxideCement 3%Ash . 2%These combine to make: 1. Tricalcium silicate C3S2. Dicalcium silicate C2S3.

Tricalcium aluminate C3A4. Tetracalcium aluminoferrite C4AF1 and 2 make up 75% of cement. 1 and 2 plus H2O equal CSH (Calcium Silicate Hydrate) which is the glue. Fly Ash is C3S plus C2S which equals Calcium hydrazide which is a white stuff and water soluble. Calcium Hydrazide and Fly Ash equal CSH. The winter and summer mixtures are different due to the weather conditions. For winter, Fly Ash is not used because it inhibits the set time of the concrete.

Also used is accelerators to help the concrete set faster. A material called Fibermesh is used in the concrete for reinforcement and to control cracking as the concrete sets. Mr. Seymore also states that heat and moisture are the main components to make concrete set up. The concrete

Thank's for Your Vote!
Arizona modern portland cement is usually attributed. Page 1
Arizona modern portland cement is usually attributed. Page 2
Arizona modern portland cement is usually attributed. Page 3
Arizona modern portland cement is usually attributed. Page 4

This work, titled "Arizona modern portland cement is usually attributed" was written and willingly shared by a fellow student. This sample can be utilized as a research and reference resource to aid in the writing of your own work. Any use of the work that does not include an appropriate citation is banned.

If you are the owner of this work and don’t want it to be published on AssignBuster, request its removal.

Request Removal
Cite this Essay

References

AssignBuster. (2021) 'Arizona modern portland cement is usually attributed'. 10 December.

Reference

AssignBuster. (2021, December 10). Arizona modern portland cement is usually attributed. Retrieved from https://assignbuster.com/arizona-modern-portland-cement-is-usually-attributed/

References

AssignBuster. 2021. "Arizona modern portland cement is usually attributed." December 10, 2021. https://assignbuster.com/arizona-modern-portland-cement-is-usually-attributed/.

1. AssignBuster. "Arizona modern portland cement is usually attributed." December 10, 2021. https://assignbuster.com/arizona-modern-portland-cement-is-usually-attributed/.


Bibliography


AssignBuster. "Arizona modern portland cement is usually attributed." December 10, 2021. https://assignbuster.com/arizona-modern-portland-cement-is-usually-attributed/.

Work Cited

"Arizona modern portland cement is usually attributed." AssignBuster, 10 Dec. 2021, assignbuster.com/arizona-modern-portland-cement-is-usually-attributed/.

Get in Touch

Please, let us know if you have any ideas on improving Arizona modern portland cement is usually attributed, or our service. We will be happy to hear what you think: [email protected]