Lockerheed tristar case study essay sample
In analyzing the cash flows @ 210 aircraft for those 10 years keeping in mind the 10% assumed cost of capital to Lockheed, the NPV of the project was -$530, 950, 000; the IRR of the project was -9%, and the project lost $480, 000, 000 when netting the costs of the project with the β